A client asked me last week and asked: “Do you do OEM or ODM?”
I didn’t answer directly. Instead, I asked him three questions. We talked for 20 minutes, and by the end, he knew the answer himself.
This article is those 20 minutes written down. But here’s a key point — costs and lead times vary by material. I’ll give you examples for acetate, metal, and injection so you can estimate accurately.
First, what is OEM? What is ODM?
OEM = Your design, our production
You bring drawings, samples, or CAD files. We open molds (if needed), source materials, make samples, and mass-produce. The design is yours exclusively.
ODM = Our design, your logo
We already have hundreds of frame designs. You pick what you like. We change colors, add your logo, customize packaging. The design isn’t exclusive — but it’s faster and cheaper.

OEM: Who is it for? How much? How long?
OEM production is best for brands with their own designers, who want exclusive frames, and can commit to reasonable MOQs.
Sampling Cost – depends on material:
-
Acetate (hand-made): No mold fee. You pay for handcrafting labor (cutting, polishing, assembly). Typically $400-$600 per frame depending on complexity.
-
Metal: Tooling fee required — usually $300–$500 per design.
-
Injection (plastic): Mold fee required — usually $1,000–$3,000 per design.
Lead time: From sketch to first sample, usually 45–60 days.
MOQ for mass production – depends on material:
-
Acetate: 100 pairs per model
-
Metal: 300 pairs per model
-
Injection: 300 pairs per color
Why our MOQs are competitive: Many factories ask for 500+ pairs for metal/injection. We keep acetate at 100 and metal/injection at 300 because we work with growing brands.

ODM: Who is it for? What are the benefits?
ODM production is best for startups, brands testing the market, or those with tight budgets.
Cost: No mold fees, no sampling fees . You pay only for the frames.
Lead time: Much faster. We keep ODM samples in stock. Pick your styles, and samples ship within 7 days.
MOQ for mass prduction – same as OEM per material:
-
Acetate: 100 pairs per model
-
Metal: 300 pairs per model
-
Injection: 300 pairs per color
Downside: The design isn’t exclusive. But if your order volume is large enough, we can sign an exclusivity agreement.
Quick comparison (with material notes)
| Factor | OEM | ODM |
|---|---|---|
| Design source | You provide | We provide |
| Mold/tooling fee | Acetate: none (handcraft cost) Metal: $300–1,000 Injection: $1,000–3,000 |
None for any material |
| Sample lead time | 45-60 days | 7 days |
| MOQ | Acetate: 100 per style Metal: 300 per style Injection: 300 per color |
Same as OEM |
| Bulk production | Acetate: ~3 months Metal: ~3 months Injection: 30–40 days |
Same as OEM |
| Exclusivity | Yes | No (negotiable) |
| Best for | Established brands, exclusive collections | Startups, market testing, fast launch |
Honestly: We’ve seen many brands insist on OEM right away, thinking it’s more “premium”. Then they pay thousands in mold fees for injection or metal, or long handcrafting lead times for acetate, without testing demand first. Most of them could have started with ODM or a hybrid approach.

The hybrid model: ODM + semi-custom
This is what most manufacturers won’t tell you. You don’t have to choose purely OEM or ODM.
How it works for each material:
-
Acetate: Pick an ODM frame. Change colors, add logo, swap lenses. No handcrafting development time. Looks unique, ships faster.
-
Metal: Use our existing metal tooling. Change plating finish, engrave logo, pick different lenses. Avoid $300–2,000 tooling fees.
-
Injection: Use our existing molds. Change color mix, add logo. Avoid $1,000–3,000 mold fees and get 30–40 day production.
We have an in-house design team that can help you turn an ODM frame into something that looks like OEM.
👉 See how hybrid works for your material
How to choose? Ask yourself three questions
1. What material are you using?
→ Acetate? Metal? Injection? The MOQ, lead time, and costs are completely different. Check the table above.
2. Do you have a production-ready design?
→ Yes → OEM might work (but check tooling fees for metal/injection)
→ No → Start with ODM or hybrid
3. What’s your first order quantity per color?
→ 100 pairs → Only acetate works at this MOQ for OEM. ODM also 100.
→ 300+ pairs → All materials possible for both OEM and ODM.
My honest advice (factory perspective):
| Your situation | Recommended path |
|---|---|
| First-time brand, acetate | ODM or hybrid (no mold fee anyway, test first) |
| First-time brand, metal/injection | ODM (avoid $500–3,000 tooling fees) |
| Have designs, need low MOQ (100) | Acetate OEM |
| Have designs, need metal/injection | Be ready for 300 MOQ and tooling fees |
| Need fast production (under 2 months) | Injection ODM (30–40 days) |
| Want exclusive design, have budget | OEM for any material |
Why BVSunglasses?

We’re a B2B eyewear factory in Wenzhou, China. We do all three materials: acetate, metal, and injection.
-
Own factory – Sales team on the floor. Ask a technical question, get an answer immediately.
-
In-house design team – Can’t draw? We’ll draw for you. From sketch to sample.
-
Material-specific MOQs: Acetate 100, Metal 300, Injection 300
-
ODM samples in stock – Acetate ships within 7 days.
-
Hybrid model – Our designs, your colors. Faster and cheaper than full OEM.
-
100% final inspection – Every frame checked before shipping.
Still not sure? Just email me.
Tell me:
-
What material are you considering?
-
Do you have designs or just an idea?
-
What’s your target quantity per color?
I’ll tell you the fastest, cheapest path — no fee, no pressure.
👉 Email us info@bvsunglasses.com or fill out this following form